Water main installation along Locust Avenue from
Magnolia Street to Maple Street
Work anticipated to be performed, July 23rd to
July 27th
·
Perform the necessary testing of the water main
along Locust Avenue
·
Perform storm sewer installations along Locust
Avenue
·
Grind In-place existing pavement along Linden
Avenue in preparation for underground utility construction.
·
Depending on work progress, begin water main
installation along Linden Avenue
Several residents are likely aware of the poor condition of
the existing water main along Locust Avenue. The existing water main is being
replaced due to its condition. Unfortunately during work this week, the
existing water main did break several times causing unscheduled water main
shut-downs. We are doing everything possible to ensure the new main is placed
into service as quickly as possible to avoid further water main breaks and
unscheduled shut-downs.
Thanks again for all your patience with the scheduled and
unscheduled disruptions to your water service.